Category
HDB & BTO
New keys, bare flat, big decisions. This category covers the practical side of renovating an HDB — what a BTO renovation really costs, how long it takes, what HDB permits allow, and which design directions work in local flats. The advice draws directly on our completed BTO projects, from a mid-century home at Tengah Garden Walk to a Japanese-inspired flat two blocks away and a wabi-sabi home at Punggol Walk.
MET Interior is CaseTrust-accredited and HDB-registered, and has designed Singapore homes since 2013. Every number we publish here comes from projects we have actually built.
18 May 2026
BTO Renovation Cost in Singapore (2026): 3, 4 & 5-Room Guide
Realistic BTO renovation costs for 2026: S$18k–S$110k depending on flat size and scope, with a full breakdown of what drives the price and w…
21 May 2026
BTO Renovation Timeline: How Long From Keys to Move-In? (2026)
A BTO renovation takes 8–12 weeks on site plus 4–6 weeks of design. The week-by-week timeline, what causes delays, and when to start plannin…
25 Jun 2026
Bathroom Renovation Cost in Singapore (2026): HDB & Condo
Bathroom renovations cost S$5k–8k for HDB, S$8k–20k for condos, S$20k+ premium. The trade-by-trade breakdown and the rules that change the p…
29 Jun 2026
Executive Maisonette Renovation: Costs & Ideas (2026)
Maisonette renovations run S$60k–120k standard, S$150k–350k for full transformations. Infrastructure-first budgeting and the staircase as ce…
2 Jul 2026
HDB Renovation Permits: What Needs Approval (2026)
Hacking, retiling, bathroom and window works all need an HDB permit — filed only by registered contractors. The full permit/no-permit/prohib…
5 Jul 2026
Open Kitchen in an HDB: Rules, Cost & Ventilation (2026)
Open kitchen conversions cost S$15k–40k and need an HDB permit. The honest ventilation trade-off, and the glass-partition compromise that be…
7 Jul 2026
Tengah BTO Renovation Guide: Cooling System, Layouts & Ideas
Tengah renovations hinge on one question: concealing the centralised cooling trunking well. Written from three completed Tengah projects.
9 Jul 2026
BTO vs Resale HDB Renovation: Which Costs Less Overall?
BTO renovations cost 20–40% less than resale — but the premium buys freedom and location. The honest side-by-side for owners choosing betwee…
10 Jul 2026
Kitchen Renovation Cost in Singapore (2026): HDB & Condo
Kitchen renovations cost S$8k–15k standard HDB, S$15k–28k full rebuilds, S$28k+ premium. Carpentry rates, worktop comparison, and where quot…
11 Jul 2026
Resale HDB Renovation Cost (2026): 3, 4 & 5-Room Guide
Resale HDB renovations cost S$55k–95k for a mid-range 4-room — 20–40% above BTO. The itemised premium, inspection checklist, and where to sa…
12 Jul 2026
4-Room HDB Design Ideas That Actually Work (2026)
4-room HDB design ideas from completed projects: the kitchen line, the third bedroom decision, storage walls, and four real styles at this s…
Frequently Asked
Common questions
How much should I budget for a BTO renovation?
For a 4-room BTO in 2026, budget S$22,000-35,000 for a light scope, S$38,000-55,000 for a mid-range renovation with full carpentry, and S$60,000-90,000+ for a designer scope with hacking and premium finishes. Three-room flats run roughly 15-20% less and five-room flats 15-25% more. Keep 10-15% aside as contingency.
How long does a BTO renovation take?
Typically 8-12 weeks of site work for a standard 4-room scope, plus 4-6 weeks of design development before works start. Light no-hacking scopes finish in 4-6 weeks. Start planning 3-4 months before key collection so permits, defect checks, and material orders do not push out your move-in date.
What renovation works need HDB approval?
Hacking walls, bathroom and toilet works, window changes, and anything affecting structure require an HDB permit filed by an HDB-registered contractor. Carpentry, painting, and most flooring overlays do not. Note that new BTO bathrooms cannot be retiled within the first three years because of the waterproofing warranty.
Should I renovate my BTO all at once or in phases?
Do wet works, electrical, and essential carpentry before moving in — retrofitting those around furniture is disruptive and more expensive. Feature joinery, extra wardrobes, and decorative work phase well and can wait. A good design plans the phase-two works upfront so nothing gets built twice.